For the record, in the past I have stated that the area around hole 1 and 2 (and hole 7 my inference for hole 7) of 2017 are likely to be homogeneous. Certainly a previous Ann talked about the area around hole 1 and 2 as been homogeneous. In the past I have stipulated, including I think in the embedded post of the original post herein, that the area around holes 3 - 6 is not likely to be homogenous IMO and therefore 50 metre spacings will be required there. Now, going back to my estimates they are for the area around holes 1 and 2 (2017) where the current drilling program (i.e. the current 20,000 metre program) is targetting). Hope that helps. AllIMO
AVZ Price at posting:
21.5¢ Sentiment: None Disclosure: Held