AVZ 0.00% 78.0¢ avz minerals limited

Running discussion on SP, page-1306

  1. 9,042 Posts.
    lightbulb Created with Sketch. 17131
    Ok, if width is 300 metres, then it is 5 drills across at 75 metre spacings (my 200 was short of 75 metre spacing) which then makes distance, on 64 holes been drilled) 960 metres at 75 metre spacings.

    So 300 across * 230 metres spod * 960 metre distance (i.e 64 holes/5* 75metres) * 2.8 specific gravity equals 185 million tonnes of ore grading 1.5% LI20 in the measured and indicated bucket. Just an opinion but term homogeneous is fundamental here as that is what gives the 75 metre spacings. All IMO
 
watchlist Created with Sketch. Add AVZ (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.