AVZ avz minerals limited

Running discussion on SP, page-1306

  1. 9,270 Posts.
    lightbulb Created with Sketch. 18988
    Ok, if width is 300 metres, then it is 5 drills across at 75 metre spacings (my 200 was short of 75 metre spacing) which then makes distance, on 64 holes been drilled) 960 metres at 75 metre spacings.

    So 300 across * 230 metres spod * 960 metre distance (i.e 64 holes/5* 75metres) * 2.8 specific gravity equals 185 million tonnes of ore grading 1.5% LI20 in the measured and indicated bucket. Just an opinion but term homogeneous is fundamental here as that is what gives the 75 metre spacings. All IMO
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.