Hi @PASBOZ ,
The basic ‘on a napkin’ maths based on @bombersmadd 's notes and posts a while back indicate………..900kt/a of SC7 from low grade middlings via a novel 3rd party process
Combine that with…………. 700kt production target of SC6 (P-LiSO4- yes aware) 60%recovery (1.58% feed grade, not yet optimised w/ 1.65% head grade). Then, ‘1600kt/a ofSC6-7’ very conservatively = 10.5mtpa equivalent mine operation achieved through vertical integration and technological ingenuity
And that doesn’t appear to include the second PLS train after optimisation
Just a 'napkin level' summation
All IMO & DYOR
- Forums
- ASX - By Stock
- Running discussion on SP
Hi @PASBOZ ,The basic ‘on a napkin’ maths based on @bombersmadd...
-
- There are more pages in this discussion • 40,519 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AVZ (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online