At the investor presentation Nige was very positive on the hydro project. Existing infrastructure is in surprisingly good condition. Needs a new roof to replace the existing asbestos one and basically new turbines which can just be put in prefabricated in place of the old ones.
- Forums
- ASX - By Stock
- AVZ
- Running discussion on SP
Running discussion on SP, page-45659
-
- There are more pages in this discussion • 36,982 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AVZ (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online