A really good listen is Lithium iron rocks episode 42. The great take from this is it explains why tier 1 grade is king. The fact that Hydroxide conversion plants need to have somewhere to get rid of there tailings is two fold. 1) the cost of the conversion loss 2) the cost of transporting the waste from the plant. The chance of getting permits in Europe for this are very low hence the greater prospect of a Hydroxide plant near mine. To me it looks like all the ducks are well and truly lined up.
- Forums
- ASX - By Stock
- Running discussion on SP
A really good listen is Lithium iron rocks episode 42. The great...
-
-
- There are more pages in this discussion • 33,100 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)