AVZ 0.00% 78.0¢ avz minerals limited

Low strip ratio can present some practical challenges in a...

  1. jl
    44 Posts.
    lightbulb Created with Sketch. 40
    Low strip ratio can present some practical challenges in a greenfield development because building ramps, roads, pads and windrows is usually done with waste /prestrip material. It could mean that you end up sacrificing some low grade material for those purposes if everywhere you dig you come up with spod.
    I think in the case of Manono given that it's an existing pit there's probably enough waste around in existing dumps (assuming no-one is planning to reprocess that material).
    If the operation was in a really sensitive heritage area it might limit where you can get waste from but to date I haven't read anything about heritage concerns.
    Any challenges the strip ratio presents are generally worth having
    Last edited by jl: 28/10/21
 
watchlist Created with Sketch. Add AVZ (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.