-
Share
3,305 Posts.
922
01/12/21
12:51
Share
I think the DRC needs to give a "favorable opinion" to the project to start the 30 day clock. This has not happened.
Dont think the "favorable opinion" is a pre-requisite to awarding the ML either.
this is a sit back and crack a beer stage. pretty funny reading the BS on here.
-