We've been waiting for ML for over 5-6 months - agreed.
I want the mining license to drop as soon as possible - but I'm actually curious as to what Nigel and team have been doing in the meanwhile. Sure, everything has been held up with the ML to be dropped by the DRC - but what have they been doing operationally during the 5-6 month period that will help gather some of that lost ground.