The early works program to be undertaken in the second half of the 2021-2022 financial year comprises approximately A$19m which has been allocated to: • Upgrade existing roads and bridges to assist with the transport of equipment to and from site. • Purchase critical mobile equipment required for initial Project development. • Progress camp construction and enter key service contracts; and - • Progress various technical studies with respect to metallurgical testwork, downstream processing and infrastructure projects. The remaining AU$6m was approved for additional resource drilling at Roche Dure
AVZ Price at posting:
$1.18 Sentiment: Buy Disclosure: Held