Ok, if width is 300 metres, then it is 5 drills across at 75 metre spacings (my 200 was short of 75 metre spacing) which then makes distance, on 64 holes been drilled) 960 metres at 75 metre spacings.
So 300 across * 230 metres spod * 960 metre distance (i.e 64 holes/5* 75metres) * 2.8 specific gravity equals 185 million tonnes of ore grading 1.5% LI20 in the measured and indicated bucket. Just an opinion but term homogeneous is fundamental here as that is what gives the 75 metre spacings. All IMO
- Forums
- ASX - By Stock
- AVZ
- Running discussion on SP
Running discussion on SP, page-1306
- There are more pages in this discussion • 80,853 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
78.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.752B |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
AVZ (ASX) Chart |
Day chart unavailable