We only have till the 28th of this month for something to be put in our "shell" or we lose our listing (at best) or go down the gurgler (at worst).
No doubt they've considered some projects, but I fear we are cutting it fine.
Would the ASX grant us an extension beyond the 28th if need be?
I hope so.
GZ
We only have till the 28th of this month for something to be put...
Add to My Watchlist
What is My Watchlist?