RVT 0.80% 31.5¢ richmond vanadium technology limited

RVT General Discussion, page-33

  1. 11,709 Posts.
    lightbulb Created with Sketch. 4845
    Read the KRR Quarterly recently. Their WA Speewah Vanadium & Titanium & Iron project is up for sale so they can focus on their WA and NT gold assets. I wonder if RVT or CMG are interested in purchasing it.

    Project details

    Vanadium-Titanium-Iron-HPA Project

    The Speewah V-Ti-Fe project has evolved over the last decade into a world class deposit. The Speewah Resource (in accordance with JORC 2012 guidelines) comprises a combined Measured, Indicated and Inferred Mineral Resource of 4,712 million tonnes at 0.3% V2O5, 3.3% TiO2 and 14.7% Fe (reported at a 0.23% V2O5 cut-off grade from the Central, Buckman and Red Hill deposits). This combined Resource comprises Measured Resources of 322 million tonnes at 0.32% V2O5, 3.4% TiO2 and 14.9% Fe, Indicated Resources of 1,054 million tonnes at 0.33% V2O5, 3.3% TiO2 and 14.9% Fe, and Inferred Resources of 3,335 million tonnes at 0.29% V2O5, 3.3% TiO2 and 14.6% Fe (refer KRR ASX release 1/4/2019 for the full resource statement details).

    The Central deposit comprises a Measured, Indicated and Inferred Mineral Resource of 1,240 million tonnes at 0.31 V2O5, 3.3% TiO2, 14.6% Fe, 12.5% Al2O3 and 4.7% MgO (reported at a 0.23% V2O5 cut-off grade). This combined resource total comprises Measured Mineral Resources of 230 million tonnes at 0.33% V2O5, 3.4% TiO2, 14.9% Fe, 12.7% Al2O3 and 4.5% MgO, Indicated Resources of 301 million tonnes at 0.31% V2O5, 3.4% TiO2, 14.8% Fe, 12.5% Al2O3 and 4.6% MgO, and Inferred Resources of 709 million tonnes at 0.30% V2O5, 3.3% TiO2, 14.5% Fe, 12.5% Al2O3 and 4.8% MgO (refer KRR ASX release 6/11/2019 for the full resource statement details).

    Mining studies were completed on behalf of KRR by CSA Global Consultants Pty Ltd (CSA Global). Como Engineers completed several Scoping and Prefeasibility engineering studies on various beneficiation-acid leach-solvent extraction-chemical precipitation process flowsheet options, producing vanadium pentoxide (V2O5), titanium dioxide (TiO2), iron oxide (Fe2O3) and HPA (Al2O3) products.

    A final project development option selected was based on a conventional open cut mining operation, and a relatively simple processing flowsheet with all infrastructures located on site including a sulphuric acid plant. The ore could be treated through onsite process plants consisting of a beneficiation plant and a downstream hydrometallurgical leaching and refining plant.

    Metallurgical investigations are currently underway to extract high purity vanadium pentoxide, titanium dioxide and iron metal, trialing some oxidative and reductive roast techniques, including the use of hydrogen as a reductant. This testwork will also look into producing vanadium electrolytes for VFB.

    Last edited by coto: 31/01/23
 
watchlist Created with Sketch. Add RVT (ASX) to my watchlist
(20min delay)
Last
31.5¢
Change
0.003(0.80%)
Mkt cap ! $27.15M
Open High Low Value Volume
31.5¢ 31.5¢ 31.5¢ $945 3K

Buyers (Bids)

No. Vol. Price($)
1 34336 31.0¢
 

Sellers (Offers)

Price($) Vol. No.
31.5¢ 16374 3
View Market Depth
Last trade - 11.24am 30/08/2024 (20 minute delay) ?
RVT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.