Dude, they agreed to build oneWHP pilot plant.
Siemens is working to supply KPO with equipment to build our modular plant which can be used with the gas plants that power the gas pipeline compressor stations.
Given the footprint of the Siemens Energy WHP plant perhaps in certain locations (ie small spaces) their unit is a better fit than ours even though ours is more efficient.
Note: In my earlier post I was going from memory when I said their footprint is 10 to 25% when it actually states 25 to 40% smaller.
- Forums
- ASX - By Stock
- Saddle Hills Project
Dude, they agreed to build oneWHP pilot plant. Siemens is...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KPO (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $7.459M |
Open | High | Low | Value | Volume |
0.3¢ | 0.3¢ | 0.3¢ | $41.20K | 13.80M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 2663179 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 10012741 | 12 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 2663179 | 0.003 |
10 | 14733666 | 0.002 |
8 | 12300000 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 10012741 | 12 |
0.005 | 6025155 | 5 |
0.006 | 99007 | 1 |
0.007 | 2043125 | 3 |
0.008 | 2536178 | 2 |
Last trade - 16.10pm 28/06/2024 (20 minute delay) ? |
Featured News
KPO (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online