KPO 0.00% 0.4¢ kalina power limited

Saddle Hills Project

  1. 10,871 Posts.
    lightbulb Created with Sketch. 1733
    KPO early this morning lodged their application to construct and operate their first project, the Saddle Hills 64MW power plant.

    To date KPO have repeated the timeframe for FNTP as 4th quarter 2021 but have been silent on the impact of when COD will occur since the FNTP was pushed back.

    The application lodged today now shows that COD is projected to be in 2023. Given the timeframe for construction as being 2022-2023 I expect COD would probably be Q3 or Q4 2023.


 
watchlist Created with Sketch. Add KPO (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
0.000(0.00%)
Mkt cap ! $9.038M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
16 14107266 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.4¢ 7492023 3
View Market Depth
Last trade - 10.04am 02/05/2024 (20 minute delay) ?
KPO (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.