You still have costs of moving the waste piles and treating it in the plant, also I think the 2 ports can handle 24mill, outter harbour capacity is 13Mt year, inner I'm not sure. But 24 rings a bell. But the issue would be railing it, most they ever railed is 9Mt, I doubt they could do more, even more trains wouldn't get that higher as the time to unload it at Port and the congestion on track wouldn't allow it, to break 9 you'd need southern iron back up.
- Forums
- ASX - By Stock
- Sale Update
You still have costs of moving the waste piles and treating it...
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)