No internal changes or capital expenditures are required at the Intec Hellyer Mill for the production of two specifications of zinc and lead concentrate, merely a change in the set points at which particular process steps are controlled. The total production does not change – remaining at approximately 60,000tpa of bulk zinc and lead concentrate. The only other significant change (apart from the expected increase in profits) is that the resource is more fully utilised, extending the life of the tailings resource.
Is 60000 tonnes of lead and zinc of no value.According to inl sentiment at the moment it is.
Please one of the downrampers provide us copperites with a costing of the sales to show your understanding of inl.
- Forums
- ASX - By Stock
- SDV
- sales
sales
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SDV (ASX) to my watchlist
(20min delay)
|
|||||
Last
50.0¢ |
Change
0.015(3.09%) |
Mkt cap ! $94.90M |
Open | High | Low | Value | Volume |
49.5¢ | 50.0¢ | 48.5¢ | $194.6K | 395.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 1814 | 48.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
50.0¢ | 88577 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 1814 | 0.485 |
2 | 36471 | 0.470 |
1 | 14000 | 0.460 |
1 | 50000 | 0.455 |
4 | 46700 | 0.450 |
Price($) | Vol. | No. |
---|---|---|
0.500 | 70000 | 3 |
0.505 | 50329 | 1 |
0.510 | 40000 | 1 |
0.515 | 3375 | 1 |
0.520 | 3174 | 1 |
Last trade - 16.10pm 26/07/2024 (20 minute delay) ? |
Featured News
SDV (ASX) Chart |