SDV 3.49% 41.5¢ scidev ltd

No internal changes or capital expenditures are required at the...

  1. 3,058 Posts.
    lightbulb Created with Sketch. 24
    No internal changes or capital expenditures are required at the Intec Hellyer Mill for the production of two specifications of zinc and lead concentrate, merely a change in the set points at which particular process steps are controlled. The total production does not change – remaining at approximately 60,000tpa of bulk zinc and lead concentrate. The only other significant change (apart from the expected increase in profits) is that the resource is more fully utilised, extending the life of the tailings resource.

    Is 60000 tonnes of lead and zinc of no value.According to inl sentiment at the moment it is.
    Please one of the downrampers provide us copperites with a costing of the sales to show your understanding of inl.
 
watchlist Created with Sketch. Add SDV (ASX) to my watchlist
(20min delay)
Last
41.5¢
Change
-0.015(3.49%)
Mkt cap ! $78.76M
Open High Low Value Volume
43.0¢ 43.0¢ 41.5¢ $113.0K 266.4K

Buyers (Bids)

No. Vol. Price($)
2 17495 41.0¢
 

Sellers (Offers)

Price($) Vol. No.
41.5¢ 7862 2
View Market Depth
Last trade - 16.10pm 05/07/2024 (20 minute delay) ?
SDV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.