Hi I hope that you are correct In their report they have stated 24 days to drii . They started drilling on the 16 th January on these calculations there is another 10 days drilling . The other wells that VPE have been involved with in the USA have always gone on for longer than thought I hope this one is the exception and comes up with a good flow Regards Towie