ADY 11.1% 1.0¢ admiralty resources nl.

santa barbara drilling progess report

  1. 988 Posts.
    DRILLING COMPLETED AT MARIPOSA
    BEST INTERSECTION IS 172M INTERVAL AT AVG 43% FE
    Highlights
    • Best intersection was 172m averaging 43.58% Fe with only 0.167 phosphorous.
    • Highest Fe average value was 45.84% over a 22 metre interval
    • 4,350 metres of reverse circulation drilling completed over 24 drill holes in 2007 plus
    4 in the 2006 campaign
    • Drilled area is approximately 1,000 metres by 500 metres
    • Mariposa tenement includes the La Chulula and La Bandera mines that were
    operated in the 1960’s for lump iron ore
    • Environmental approval permit issued to mine 1.2m tonnes per annum
    The Board of Directors are pleased to announce very encouraging drilling results from its latest
    program supervised by its Consultant SRK in its 50% joint venture Cia Minera Santa Barbara’s
    Mariposa tenement, located four kilometers from the main processing plant at Japonesa.
    The grades encountered are very encouraging and mine planning will commence immediately.
    SRK will produce a JORC estimate on a measured or indicated basis of the reserve including
    data from the existing lump vein mines at La Chulula and La Bandera.
    SRK expect results from its drilling program at Japonesa to be released shortly.
    This result completes the geological due diligence work prior to commencement of mine
    planning.
    Yours sincerely,
    Phillip Thomas
    Managing Director
    [e] [email protected]
 
watchlist Created with Sketch. Add ADY (ASX) to my watchlist
(20min delay)
Last
1.0¢
Change
0.001(11.1%)
Mkt cap ! $16.29M
Open High Low Value Volume
1.0¢ 1.0¢ 1.0¢ $6.018K 601.8K

Buyers (Bids)

No. Vol. Price($)
1 1000000 1.0¢
 

Sellers (Offers)

Price($) Vol. No.
1.1¢ 500000 1
View Market Depth
Last trade - 15.41pm 26/06/2024 (20 minute delay) ?
ADY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.