That Mister Lincoln is making the big mistake because the full capacity of 2 trains of GLNG is 10 mpta, not 7.2 mpta. Therefore when the two trains be coming down the track, they will be using 600 PJ per year. Even idiot can see that.
Alvin I.805 (class '49)
Add to My Watchlist
What is My Watchlist?