CVN 3.13% 16.5¢ carnarvon energy limited

Santos Investor Day, page-19

  1. 6,317 Posts.
    lightbulb Created with Sketch. 2512
    Googling, I found the Goliat FPSO built for Norway in 2012 (ordered 2010) has a similar capacity (~100,000 bopd) with gas reinjection and cost $1.1B, built in South Korea. That was during the height of the oil boom so I'd hope that even adjusted for inflation the current cost of a 100k FPSO would be a bit cheaper. It was also an unusual circular design. All in all it looks like if Dorado FPSO comes in under a billion that'd be a good result
 
watchlist Created with Sketch. Add CVN (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.