What the hell are you talking about I’ve been posting for the last two months the build of the first eight is going to cost €5.2 million that comes up to be AU$8.4 this is why I said $15 million is not enough to get them up with the 15 mill they are short figures don’t match up.
because in the prospectus MEIR is saying that it’s only costing 4.7 mill for build.
Myself a sophisticated investor and a few still positive people that post on this stock spoke to Meir And said why are the 8 /6Usatellites costing more than the Pearl constellation
Meir response
The pearls Constellation was tended out to the bidders to get good price and it was a bulk deal of 200 satellites
The 6U satellites cost more because it’s not tended out and theirs only 8
If we do another 8 second batch will be cheeper
I HOPE THAT ANSWERS YOUR QUESTION AND INCE AGAIN ILL POST THE ANNOUNCEMENTS ANOUT HOW MUCB THEY WILL COST
THERE AND LOOK AG THIS DOES NOT ADD UP FOR GHE BUILD I EMAILE MEIR ANOUT IT.
4.7 to build he thinks we are all fools not this time I won’t be fooled.
- Forums
- ASX - By Stock
- SAS
- SAS Possible Disallowed from 0.5c
SAS Possible Disallowed from 0.5c, page-75
-
- There are more pages in this discussion • 455 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SAS (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online