my fav lines out of that statement.
"These estimates enabled completion of a Conceptual Mining Study by CSA
Global that defined a potentially viable open pit mining project on a mining resource of 23.4
Mt at 0.85% copper. CSA Global designed satellite open pits to access the two orebodies, with
a combined strip ratio of 3.5:1 at a production rate of 1.5Mtpa over an initial 15 year mine
life."
Thats right a 15 year mine life
"As per the studies conducted to date and based only on the Kangaluwi and Chisawa resources,
over an initial 15 year life the Kangaluwi Copper project could produce around 56,400t of
concentrate per year containing around 14,100t copper metal per year. In addition there is a
by product gold credit of around 5,800 ozs of gold per year in concentrate."
Add to My Watchlist
What is My Watchlist?