Mosy of this is covered in the BFS. Still comes out with a Rev: Cost Ratio above 2.
no airport for mining staff to fly in fly out. No there isn't, what's the relevance? Clearly indicates the transport method is via trucks. Iluka's Cataby project is trucked, Base's Kwale - trucked. That's the method.
steep gradiant of deposit - Wrong. It's nearly flat.
60 m down - Wrong. It's at surface.
Slimes will likely cover top layers. Where are you getting this from? Check the BFS.
huge opex to get below this to get to deposit Wrong. It's at surface.
NO financiers yet appearing after so long Obvious.
I would like to see:
costings of on-site opex for proposed mining BFS
transportation feasibility costings BFS
this stock is on my radar, as probably a numbers of others, but The SP is still too rich in my analysis.
On your radar? so what do you like about it, since you've outlined everything that you don't.
- Forums
- ASX - By Stock
- SFX
- Schadenfreude and Binary Outcomes
Schadenfreude and Binary Outcomes, page-67
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SFX (ASX) to my watchlist
|
|||||
Last
33.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $131.7M |
Open | High | Low | Value | Volume |
35.0¢ | 35.0¢ | 33.0¢ | $23.83K | 70.52K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 66510 | 33.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
35.0¢ | 1000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 66510 | 0.335 |
1 | 33491 | 0.330 |
6 | 214281 | 0.320 |
3 | 52385 | 0.315 |
2 | 3800 | 0.310 |
Price($) | Vol. | No. |
---|---|---|
0.350 | 1000 | 1 |
0.390 | 20000 | 1 |
0.395 | 42000 | 1 |
0.420 | 30000 | 1 |
0.430 | 10000 | 1 |
Last trade - 16.10pm 12/07/2024 (20 minute delay) ? |
Featured News
SFX (ASX) Chart |