Here is the information that we should see in the study according to QBL from a precious date. In detail........we hope.
18 August 2014
Update on South Johnstone Bauxite Project
Scoping Study
The previously announced exploration results and bauxite test results at the Project to date have been highly encouraging. The previously announced Mineral Resource estimate forms the basis of the Scoping Study by an independent expert consultant which is currently underway and advancing well.
The scoping study includes but is not limited to:
Review of existing data
Review current resource basis and definitions
Examine ore reserve assessment requirements, including the definition of any differing ore types
Conduct site visits to view ground conditions and gather relevant cost and development data
Development of preliminary design criteria and mine planning
Budget estimate for mining capital and operating costs
Determine any requirements for process test work sampling and a preliminary test program. Outline possible flow sheet investigation
Budget estimate for transport operating to port
Port and shipping suitability
Budget estimate of port/shipping charges
Review land access
Environmental criteria and recommend review requirements including local and regional social and political impacts
Infrastructure options including the availability of services and resources, particularly power and water supply and alternatives for site access for product handling
Suggested site investigations and other engineering programs to prepare for feasibility level investigations
Develop economic criteria and a preliminary financial analysis spreadsheet