having spent years of my youth in the usa uranium industry
i can tell you the blr operation will be very fast
in the past and now a lot of the uranium production in this location has been buy farmers as the In situ leaching method is fast and inexpensive to setup but most importantly they are in uranium production heaven as mills and other uranium based infrastructure is present so blr dont need to spend 600mill building a mill and wait 2 or 3 years for it to be developed.
when people realise production is sooner than later blr will be the one to hold
remember no mill needs to be built and In situ leaching method is fast and inexpensive to setup
- Forums
- ASX - By Stock
- BLR
- scoping study review
scoping study review, page-13
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)