Two main options are being examined:
i)A processing plant at Archangel, processing the Archangel (Kay Tanda)“stock work” resource and transporting the high grade South West Breccia resource to the central processing plant.Targeting average production of 30,000 oz per annum for >5 years.
ii)Asmaller, lower capital cost,processing plant at Lobo, initially processing South West Breccia high grade resources only then processing potential additional resources discovered through the new, planned,drilling campaign. Targeting production of 15,000oz per annum for >5 years.
Correct me if i am wrong but ounce price of gold is usd1262.5, lets says cost of production is $650, the yearly income would be (45000*(1262.5-650))= 27.5M usd.
- Forums
- ASX - By Stock
- scoping study
Two main options are being examined:i)A processing plant at...
-
-
- There are more pages in this discussion • 44 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RMX (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $3.486M |
Open | High | Low | Value | Volume |
0.9¢ | 1.0¢ | 0.9¢ | $2.996K | 332.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
10 | 2451125 | 0.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.0¢ | 1396049 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
10 | 2451125 | 0.008 |
9 | 1993856 | 0.007 |
5 | 1664861 | 0.006 |
2 | 1199995 | 0.005 |
2 | 418888 | 0.004 |
Price($) | Vol. | No. |
---|---|---|
0.010 | 1396049 | 7 |
0.011 | 838750 | 3 |
0.012 | 1036082 | 2 |
0.013 | 185103 | 1 |
0.014 | 8636 | 1 |
Last trade - 13.41pm 17/10/2024 (20 minute delay) ? |
Featured News
RMX (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non Executive Director
Simon Kidston
Non Executive Director
SPONSORED BY The Market Online