    lightbulb Created with Sketch. 138
    The estimated operating costs for the Gullewa concentrator, including
    administration, is A$48.81 per tonne of ore processed for oxide and transitional
    material and A$37.53 per tonne of ore for primary material. This is based on mill
    throughout of 250 000 tonnes per annum.
    If thats all it cost to process 90,000ounce stockpile than they are going to make sh*t loads. No funding required
    The total capital cost is estimated at $15.3M, comprising $13.8M for the
    processing plant and infrastructure, and $1.5M for mine development – with the
    refurbishment of the existing crushing and milling circuit at Gullewa, the
    proposed addition of a copper concentrator and the upgrade of the existing camp
    from 40 to 86-person capacity representing the principal capital components.
    Dont need to upgrade to 86 person camp 40 will do if you are only processing ore. No $1.5million for mine development either.
    Looking better the more i read. Hope im on the right track
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.