BMN 5.28% $2.87 bannerman energy ltd

scoping study

  1. 281 Posts.
    What a waste of time speculating on Capital raising or take over. It can only be the long awaited scoping study. Numbers are either Very bad Or very good. And the 2.80 bid makes one think Good

    1. Scoping studies numbers are good Lets have some guesses.

    a) Cost to Mill $15 Lb
    b) Cost to Dig Up $10 Lb
    c) Total cost per Pb $25
    d) Expected average sale price per pb ($90 to $125)
    e) Mine Life 15 years
    f) And 8 more definite targets for a possible 100 year mine life.
    g) BMN set to become the SHELL or BP of the future
 
watchlist Created with Sketch. Add BMN (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.