Just going over a past presentation June 10th 2008. from this presentation it can be seen that the "Scoping Study Completed (subject to JORC)" so here we are nearly 2.5 Months from this presentation and no sign of the scoping study, would it be reasonable to ask the Co "where is it?, or what's the delay",
Hey I'm getting old here, don't want to kick the bucket before production...lol..
----------------------------------------------------------
Achievements to date and Forward Program
20,000 metre RC drilling program committed; 12,000 m drilling already completed in 2008.
Aim is for an initial JORC resource by July 2008.
Additional Diamond drilling to commence.
Detailed Geophysical surveys commissioned; Preliminary Gravity survey
completed.
Heritage clearance surveys completed at Railway East Target Area,
Jumbo Junction Target Area and Yandi Headwaters CID Target Area.
Environmental studies commenced.
Scoping Study Completed (subject to JORC)
Port Facility negotiations at Port Hedland continue.
Pre-Feasibility studies initiated.
Production aim for late 2009.
------------------------------------------------------------
Significant Exploration Potential
Three major target areas for drilling commencing in July
2008
Railway East Target Area is a 6km strike zone under cover
east of the main Railway Prospect.
Jumbo Junction Target Area, 5km west of BHPB Area C
Mine, has potential for major Marra Mamba discovery.
Yandi Headwaters Channel Iron Deposit Target Area,
located upstream of the BHPB Yandi Mine has potential for
a major near surface CID discovery.
Ten other exploration target areas have been identified
elsewhere on the UMC leases.
------------------------------------------------------------
PILBARA IRON ORE PROJECT -
DEVELOPMENT OPTIONS
Scoping study completed and pre-feasibility studies underway with Prodetheus
Consultants
The pre-feasibility studies will include accessing the FMG multi-user railway
located 110km north of the prospect and associated multi-user port facilities at
Port Hedland.
The following project development concepts will be examined:
A 2 million tonne per annum direct shipping ore (DSO) operation using contract
mining, crushing and screening, with road haulage of the DSO products to a
railhead on the multi-user FMG railroad for rail freight to Port Hedland for export.
A 5 million tonne per annum direct shipping ore (DSO) operation using contract
mining, crushing and screening, with a purpose built spur rail haulage of the DSO
products to connect with the multi-user FMG railroad for rail freight to Port
Hedland for export.
A 10 million tonne per annum direct shipping ore (DSO) operation using contract
mining, crushing and screening, with a purpose built spur rail haulage of the DSO
products to connect with the multi-user FMG railroad for rail freight to Port
Hedland for export.
Pre-feasibility studies to be accelerated on completion of initial JORC Resources
Discussions underway with Port Hedland Port Authority to reserve handling
facilities at the port
- Forums
- ASX - By Stock
- UMC
- scoping study
scoping study
-
- There are more pages in this discussion • 42 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add UMC (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online