Yes SDV only peoples
If i add Mt Cattlin in then its around A$7.14 and I left out James Bay
Column 1 Column 2 0 Calendar Year 2022 1 SDV 2 LCE production tonnes 25,000 3 Price per tonne (USD) 12,000 4 Operating Cost per tonne + royalties (USD) 4,140 5 EBITDA (USD) 196,500,000 6 AUDUSD 0.8 7 EBITDA (AUD) 245,625,000 8 Attributable to GXY (80%) 196,500,000 9 Interest (A$100m debt) @ 10% - 10 Depreciation 1,740,000 11 Taxes @ 30% 58,428,000 12 NPAT (AUD) 136,332,000 13 EPS of SDV (400m shares) 0.341 14 15 Mt Cattlin 16 Spodumene tonnes 180,000* 17 Price per tonne (USD) 860 18 Cost per tonne incl royalties and marketing (USD) 500 19 EBITDA (USD) 64,800,000 20 AUDUSD 0.8 21 EBITDA (AUD) 81,000,000 22 Interest AUD (USD 40m debt) 3,500,000 23 Depreciation 344,148 24 Taxes @ 30% 23,146,756 25 NPAT (AUD) 54,009,096 26 EPS of Mt Cattlin 0.135 27 28 Total EPS 0.476 29 PE 15 30 Target SP 7.14
*assuming new circuits to be introduced brings the recoveries to 70%
Add to My Watchlist
What is My Watchlist?