2015-02-11
The work has now started in Ghana with the assembly and installation of generators and switch gear equipment for the first set of 6 units for the final 400kW-park. The assembly of the generators are proceeding well and all six of them will be ready for testing within a few weeks.
http://www.seabased.com/en/newsroom
Cheers
- Forums
- ASX - By Stock
- CWE
- Seabased AB Sweden
Seabased AB Sweden
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)