AEV 10.0% 1.1¢ avenira limited

seabed mining costs from nz project, page-9

  1. 30 Posts.
    As stated by this line

    "Jan de Nul has proposed a mining and transporting methodology which delivers material pumped to shore storage for Euros 33 per m3 or US$26* per tonne"

    The cost of the $26 is simply to get the material (sand) to the shore. From here i believe some type of beneficiation or refinement is necessary.

    So to conclude the $26 is accurate, but that is not the complete OPEX cost as other costs will be incurred to get the material to saleable quality
 
watchlist Created with Sketch. Add AEV (ASX) to my watchlist
(20min delay)
Last
1.1¢
Change
0.001(10.0%)
Mkt cap ! $29.74M
Open High Low Value Volume
1.0¢ 1.1¢ 1.0¢ $4.126K 412.5K

Buyers (Bids)

No. Vol. Price($)
1 142059 1.0¢
 

Sellers (Offers)

Price($) Vol. No.
1.1¢ 4589025 6
View Market Depth
Last trade - 16.10pm 16/08/2024 (20 minute delay) ?
AEV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.