AEV 0.00% 1.0¢ avenira limited

As stated by this line"Jan de Nul has proposed a mining and...

  1. 30 Posts.
    As stated by this line

    "Jan de Nul has proposed a mining and transporting methodology which delivers material pumped to shore storage for Euros 33 per m3 or US$26* per tonne"

    The cost of the $26 is simply to get the material (sand) to the shore. From here i believe some type of beneficiation or refinement is necessary.

    So to conclude the $26 is accurate, but that is not the complete OPEX cost as other costs will be incurred to get the material to saleable quality
 
watchlist Created with Sketch. Add AEV (ASX) to my watchlist
(20min delay)
Last
1.0¢
Change
0.000(0.00%)
Mkt cap ! $27.04M
Open High Low Value Volume
1.0¢ 1.0¢ 1.0¢ $610 60.98K

Buyers (Bids)

No. Vol. Price($)
11 7056687 1.0¢
 

Sellers (Offers)

Price($) Vol. No.
1.1¢ 953426 2
View Market Depth
Last trade - 15.37pm 11/10/2024 (20 minute delay) ?
AEV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.