CRI 0.00% 1.2¢ critica limited

second hole to be completed by weeks end, page-15

  1. 3,038 Posts.
    lightbulb Created with Sketch. 1
    Smuggler

    Your a tool!!!

    The drill rig obviously dosnt drill 25m a day at the top of the hole, PT was just estimating what would be drilled near the bottom of the hole, top of hole is probably 100m, your 40 days @ 25 per day is just dumb.

    The hole is nearly completed do your bloody sums on that one.

 
watchlist Created with Sketch. Add CRI (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.