KAB 0.00% 0.1¢ kaboko mining limited

THIRD SHIPMENT CONFIRMS HIGH GRADE OF 55% MnThe testwork was...

  1. 1,438 Posts.
    THIRD SHIPMENT CONFIRMS HIGH GRADE OF 55% Mn

    The testwork was completed by a major Chinese trading company (rated one of China’s top 100 listed companies, with annual trade volume exceeding RMB 10 billion) and one of the leading importers of ferrous and non-ferrous metals into China. The testwork is the third independent analyses and testwork completed on the manganese ore produced and exported from the Company’s Emmanuel Project in Zambia.
    As a result of the testwork completed which has verified previous results, the Company has received from them a second indicative and non-binding offer of an off-take agreement, for the supply of a minimum 48% manganese ore lump product, that is proposed to be priced at a premium to BHP’s reference price (expressed in US$ DMTU (per dry metric ton unit Mn content)), CIF China basis. The Company is currently reviewing the terms and conditions of the indicative off-take agreement and will update the market in the event a binding agreement is reached.
 
watchlist Created with Sketch. Add KAB (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.