They only have 2m tpa scheduled until September 2012 when the big magnetite volumes kick in.
However, look at the recent presentation (link above)
No problem with volumne at the mine, no problem loading to rail. (Stockpiles of ore)
At the port 5000 ton per hour rail unloader coupled with a 5000 ton per hour ship loader. And they have 255,000 tonne iron ore storage sheds at the port.
From my recollection the ship loader facility can handle up to 16m tpa, so as long as they can keep the ships up to it they should not need Oakagee to get their volumes out in the near future.