ICN 0.00% 0.6¢ icon energy limited

BPT Monthly Drill Report outEncounter-1 work over...

  1. 1,402 Posts.
    lightbulb Created with Sketch. 108
    BPT Monthly Drill Report out

    Encounter-1 work over completed.

    Diagnostic fracture test of Patchawarra formation conducted initiation pressure consistent with Holdfast-1 well.

    Main fracture stimulation to commence second half of April with Patchawarra Formation to be stimulated and flow tested for 30 days.

    No mention of 855 and ensign rig.
 
watchlist Created with Sketch. Add ICN (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.