SGQ 0.00% 2.5¢ st george mining limited

Further drilling is only anticipated after the Project is...

  1. 451 Posts.
    lightbulb Created with Sketch. 82
    Further drilling is only anticipated after the Project is running, considering that fact that the current Measured and Indicated Resources are enough for more than 20 years of the forecasted life of mine.
 
watchlist Created with Sketch. Add SGQ (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.