The bulk of this target will be achieved by wind farms. They take about 18 months to design & construct from when the contracts are signed. The rate of growth of wind power has placed Oz at around number 3 in the world for wind power generation per head.
If GDY were building a solar farm out in the desert it would already be connected to the grid and producing power, and the company would be producing a profit.
Butchy.
- Forums
- ASX - By Stock
- RNE
- sector in for a needed boost
sector in for a needed boost, page-3
-
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RNE (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.590M |
Open | High | Low | Value | Volume |
0.2¢ | 0.2¢ | 0.2¢ | $4.125K | 2.75M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
119 | 205641728 | 0.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.2¢ | 42393850 | 10 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
119 | 205641728 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.002 | 42393850 | 10 |
0.003 | 15911107 | 21 |
0.004 | 2753578 | 6 |
0.005 | 1201800 | 3 |
0.006 | 269000 | 1 |
Last trade - 15.08pm 01/11/2024 (20 minute delay) ? |
Featured News
RNE (ASX) Chart |