AW1 american west metals limited

See CU Ver

  1. 20 Posts.
    lightbulb Created with Sketch. 31

    Continuity !! when looking at hole SM 24-02 chart here showing the copper widths and percentage of copper contained in that section and depth starting from surface.

    The perfect drill hole if there ever was a perfect hole would show ore continuity starting @ surface and down through out the drill core to bottom of hole depth ideally which would then have little strip ratio of over burden..

    Look here @ SM-24-02

    Starting @ 6 m from surface and going down to 10m you have 4m of .61 copper %. The 6m above this would be consider waste adding to strip ratio..

    Continuing, from the 10m down to 11.9 depth again waste but then at 11.9 depth down to 26m we see 14.1 m of 4.9 % cu.

    PS,. NOTICE when in same meters mention here being from 11.9 to 26m the section from including 18.4 down to 26m was 7m @ 8.15% which was included into the total of section from 11.9m depth down to 26m depth.
    Notice next, from 35m down to 37m there is 2m of strip ratio, but then 37m and down to 44.5m GOOD then strip ratio between 44m down to 51m.The next section from 51m down to 65m good ,..

    Between 65m down to 99m still above the 0.39 % cut -off for profit..

    SM24-02

    6

    10

    4

    0.61

    0.0

    3.8

    11.9

    26

    14.1

    4.90

    0.0

    7.0

    Including

    18.4

    26

    7.6

    8.15

    0.0

    5.9

    27

    29

    2

    1.08

    0.0

    1.0

    30.35

    32.5

    2.15

    1.18

    0.0

    1.8

    33

    35

    2

    3.88

    0.0

    4.0

    Including

    33

    34

    1

    6.86

    0.0

    6.0

    37

    40

    3

    8.81

    0.0

    12.2

    Including

    37

    38

    1

    24.40

    0.0

    32.0

    41.5

    44

    2.5

    3.12

    0.0

    4.0

    Including

    41.5

    42.5

    1

    6.30

    0.0

    7.0

    51

    55

    4

    3.24

    0.0

    3.7

    Including

    51.85

    54

    2.15

    5.64

    0.0

    5.8

    56

    65

    9

    3.76

    0.0

    3.1

    Including

    58

    59.9

    1.9

    10.54

    0.0

    6.9

    and

    63

    64

    1

    2.06

    0.0

    2.0

    66

    69

    3

    0.30

    0.0

    1.0

    71

    73

    2

    0.43

    0.0

    1.0

    74

    76

    2

    0.49

    0.0

    1.0

    80

    81.5

    1.5

    1.12

    0.0

    0.8

    85.3

    86

    0.7

    2.35

    0.0

    1.0

    92.5

    93

    0.5

    1.75

    0.0

    1.0

    Thomas Ullrich, Chief Executive Officer of Aston Bay ,commented:

    "Storm continues to deliver impressive results from the delineation drilling program conducted by our partners American West. Long intercepts of high-grade copper mineralization from the surface bode well for potential development at the project. We look forward to more drill results in the coming weeks as we work toward calculating the maiden resource for Storm."

    image.png

    Figure 1: Storm Project team geologists Rachel Borg and Jordan Mathieu review the drill core from metallurgical drill hole SM24-02 (see Table 1 for details).
    Let The Drills Be Our Friends

    Traps7

 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
3.8¢
Change
0.002(5.56%)
Mkt cap ! $28.29M
Open High Low Value Volume
3.6¢ 3.8¢ 3.5¢ $136.2K 3.777M

Buyers (Bids)

No. Vol. Price($)
4 1307911 3.6¢
 

Sellers (Offers)

Price($) Vol. No.
3.8¢ 219999 2
View Market Depth
Last trade - 16.10pm 13/06/2025 (20 minute delay) ?
AW1 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.