CTP 0.00% 5.3¢ central petroleum limited

Seems obvious to me too Klaas, we will have 2 holes drilled by...

  1. 315 Posts.
    lightbulb Created with Sketch. 9
    Seems obvious to me too Klaas, we will have 2 holes drilled by sept 2013.


    To be done by
    Third
    Quarter
    Procedures to secure a P
    roduction
    Licence
    and relevant related agreements
    are
    currently being
    pursued
    at a
    quick
    d
    eliberate pace. The Preliminary Field Development Plan along with the
    Environmental Management Plan and related compliance plans are nearing completion and will be
    filed with the relevant authorities
    in May 2013
    . The process requires the approval of the
    Central Land
    Council, the Northern Territory Department of Mines and Energy,
    the
    Traditional Owners and land
    access agreements with the current owners.
    Central
    is finalis
    ing the Project Schedule and Budget. Since remote operations benefit greatly from
    eco
    nomies of scale (i.e. move out one rig and drill two wells to reduce mobilisation costs per well), the
    Surprise development is being planned as a two well project
    with optional additional wells
    . The first
    well will test the east
    ern side of the Surprise fa
    ult targeting a
    5.9 million barrels 2C Resource. The
    second is an exploration well to test the original objective on the west side of the fault that was not
    successfully reached while drilling Surprise. After testing exploration targets in the Bitter Spr
    ings and
    Horn Valley Silt (Shale) the well will be used to either produce from the Stairway
    oil reservoir
    or as an
    injector for pressure maintenance in the discovery well.
    Dynamic modelling to optimize completions will be undertaken during this time frame
    to assure the
    wells perform as efficiently as possible.
    Planning and long lead procurement for the drilling of th
    e wells is currently underway.
    Rigs are
    currently being sourced for the Surprise de
    velopment/exploration project.
    Casing and tubulars and
    re
    lated well equipment
    are
    being sourced, as are vendors for various services like logging, cementing
    and facilities construction.
 
watchlist Created with Sketch. Add CTP (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.