FAR 0.00% 48.0¢ far limited

wont be able to complete the survey undertow, if their engine...

  1. 797 Posts.
    lightbulb Created with Sketch. 66
    wont be able to complete the survey undertow, if their engine room isn't up and running neither will be their air compressors which are needing to make the acoustic boom for the measurements. Likely if they have lost power, it will be a mission to retrieve the streamers behind them. That can be a long an arduous task if you can't maintain the vessels heading, as don't want to damage the gear of seismic sensors tow wires which have cores transmitting the data back to vessel...They can be up to 10km long. But as mentioned, no material delay on FAR and the SNE development, as the sub contractor will have to get another vessel in to complete the contracted job... Time delay only, potential delay in reviewing the data set.
 
watchlist Created with Sketch. Add FAR (ASX) to my watchlist
(20min delay)
Last
48.0¢
Change
0.000(0.00%)
Mkt cap ! $44.35M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
2 79066 48.0¢
 

Sellers (Offers)

Price($) Vol. No.
48.5¢ 9050 1
View Market Depth
Last trade - 16.12pm 08/08/2024 (20 minute delay) ?
FAR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.