I need to correct a previous post I made. Although I was unsure as to the conditions the IP number was given, I did presume it was done without the new Gas Lift systems in place.
That is incorrect so my apologies if I did mislead anyone here.
If people read the last P&D report, it states the report is up to the 15/6/ 2013. So the gas lift system was started 2 days prior to the IP test which unfortunately makes the figure even worse ????
That's my understanding.
- Forums
- ASX - By Stock
- selling has finished on ggp - up from here
I need to correct a previous post I made. Although I was unsure...
-
- There are more pages in this discussion • 18 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)