"Now CTO has a specific plan to increase production, I also believe its plan is based on recent drilling results, for it's reliable."
Yes, this drilling is underground mine planning drilling. 18k oz has been drilled at the WS19 panel or "pod" and will be produced this year. Moreover, the decline has been developed 600m ahead of WS19 and several other areas have been identified for mine planning drilling that I'm told can be done quite quickly, about one and a half months for each. Produce 15k oz in Q409 and the share price will be much higher than 17c. Longer-term, the geophysical drilling will potentially prove a lot more productive in identifying these pods, given we're told that 80% of the gold is associated with the iron sulphides.
Rowingboat
- Forums
- ASX - By Stock
- selling welcome
"Now CTO has a specific plan to increase production, I also...
-
-
- There are more pages in this discussion • 65 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CTO (ASX) to my watchlist
|
|||||
Last
0.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $12M |
Open | High | Low | Value | Volume |
0.4¢ | 0.4¢ | 0.4¢ | $20.71K | 5.177M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
24 | 14414790 | 0.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.5¢ | 2859251 | 8 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
24 | 14414790 | 0.004 |
12 | 6292353 | 0.003 |
5 | 5395025 | 0.002 |
9 | 13202988 | 0.001 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.005 | 2406790 | 7 |
0.006 | 4680000 | 4 |
0.007 | 305857 | 2 |
0.008 | 3222992 | 4 |
0.009 | 1537558 | 4 |
Last trade - 13.09pm 28/06/2024 (20 minute delay) ? |
Featured News
CTO (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online