EWC 0.00% 0.9¢ energy world corporation ltd

sengkang drilling commenced ? dated 15/1/13

  1. 950 Posts.
    lightbulb Created with Sketch. 13
    Old news but seems they already knew where to drill back in January.

    Lyrics EEES Drilling 23 Gas Wells Tue, 15 January 2013 | 13:14
    Tag
    --- Sengkang Cooperation Contract in South Sulawesi BP Migas, Energy Equity Epic Sengkang (EEES) will perform at Wajo gas development. The development plan includes drilling 23 production wells and six eksplorasi.Selain gas drilling and exploration, EEES also plans to build two gas units plan mmscd capacity of 35 and 85, the installation of a gas pipeline facility development drilling, construction of supporting facilities and construction of compressor facilities. " To meet the increasing demand for gas, then EEES plans to undertake the development of a gas field in Sengkang block, Wajo, "said PR EEES, Baso Firman.Lapangan gas field to be developed, namely Kampung Baru, Walanga, and Sampi Sampi-Salobulo. In addition, the search process gas in five districts namely Sajoangin, Penrang, Majauleng, respectively Pammana Wajo in District Two and District Boccoe Bone. "There is now in the process of siesmic, and special Walanga Kampung Baru Field, and Sampi Sampi- Salobulo in Wajo land has been liberated, "katanya.Sementara for area-Sampi Sampi Walanga and is now in the process of cleaning area Land Clearing drilling). "Especially for the well Walanga 1,2 and 3 in the Village Laniku and Bottotanre majauleng district is in the process of drilling (drilling an early stage)," katanya.Kadis PSDA, Energy and Mineral Wajo Perkesi hope Firman said Wajo gas to the city. In addition, the plan in 2013 will be built in Wajo Fueling Station gas (SPBBG) after a special city Sulawesi gas.Dia say, is the most Wajo eligible for SPBBG for Development, has a reason besides Wajo gas resources enough. Firman, disclose, Sengkang town also been included in the road map SPBBG director general of oil and gas development, the Ministry of Energy for fiscal year 2013. Gas plans for the conversion of a single package, with 1 mmscdf gas allocation which is allocated for domestic gas. "So the gas will be taken from the allocation of household 1 mmscfd gas which will also be managed by enterprises Wajo Energy Jaya," said the word . (cr5/ary/d)


    An update from EWC re drilling would help.
 
watchlist Created with Sketch. Add EWC (ASX) to my watchlist
(20min delay)
Last
0.9¢
Change
0.000(0.00%)
Mkt cap ! $27.71M
Open High Low Value Volume
0.9¢ 0.9¢ 0.9¢ $1.026K 114K

Buyers (Bids)

No. Vol. Price($)
4 1834991 0.8¢
 

Sellers (Offers)

Price($) Vol. No.
0.9¢ 185999 1
View Market Depth
Last trade - 11.05am 06/08/2024 (20 minute delay) ?
EWC (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.