EWC 10.0% 1.1¢ energy world corporation ltd

Sengkang PPA extension meeting

  1. 948 Posts.
    lightbulb Created with Sketch. 13

    Make up your own mind where we stand with the 2022 extension !!!

    Existing Power Plants in Wajo Entered the 80th Place Threatened With Unused, Trade Unions and DPRD Struggled to Find a Solution



    AVvXsEgLQiMsLfHLw8un3FxktyZFbWQ5GAkm1lCZa184vYBtL4ayiiim1U5B_tM26JTI0fpWvahV2aC1gtcJqDTvYJFhdh_icNNYxdI2p-Fs58z4UNwFYORPaQrtCdsBlixcS8zOdzQ2Xbi8rXbNUCQFwcKeo74p7QdBE5gCuUFXyjZ4dOQb3GqXtHxX5DUqzg=s320
    The aspirations of the trade union related to the continuation of the contract of PT. Sengkang Energy with PT. PLN (muhlis dock photo)

    The Wajo Regency DPRD received aspirations from the Mining and Energy Federation of the Confederation of Trade Unions Throughout Indonesia, related to the expiration of the contract between PT. Sengkang Energy with PT. PLN in 2022 which until now has not been clear with the contract renewal agreement. Friday, 24/12/2021


    Aspirations were accepted by AD Mayang as Chairman of Commission IV, Chairman of Commission II H.Sudirman Meru, and Chairman of Bapemperda Ir.Junaidi Muhammad


    Chairman of FPE- KSBSI Kadir Nongko, said the goal of coming to the DPRD is not only to demand employee rights but to the stability of the company or the continuity of the company and there is a team assigned from the company and to this day the owner has no extension and if there is no end pt. Zinc Energy


    "Why the team formed has not moved until today and we have sent a letter to the Owner, because of our great desire to the Wajo Regional Government and the Wajo Regency DPRD to help us to be able to extend the Sengkang Energy contract," he asked.

    Kadir Nongko also said that if the contract is not renewed there must be an effect and has also been conveyed to the Regent of Wajo and understands what will be caused, because according to him this has to do with the survival of many people and has been conveyed to the owner of modak, he explained.


    Chairman of the aspirational team, AD Mayang that what Kadir Nongko said, there is true politics entering in SOEs and we also have to start from the bottom politically and regulationally.

    "We will submit to the Chairman first for a limited internal meeting of the Chairman, a new limited commission meeting invites the team and conveys to the center khsusnya Dapil II at the central level and can actually be the same to the Ministry, that's my answer temporarily and praying for the contract to be extended," said AD MAYANG.



    While Bapemperda Chairman, Junaidi Muhammad expressed his gratitude, meman there is a threat because we are in the order of 80 of the power plant threatened to be unused. And there must be follow-up because this is a threat and how the DPRD can communicate well with PLN, explained Junaidi Muhammad.


    While the Chairman of Commission II of the Dprd of Wajo Sudirman Meru Regency, Insyah Allah in the future suggested a limited leadership meeting and a Commission II meeting.

    "We from Commission II have visited In Energy related to the extent of the water tax, we also talked non-formally questioning the follow-up of pt. Energy in October 2022. And the information that PLN Communication still provides space for PT. Sengkang energy, because PT. PLN is still thinking about three aspects, namely business aspects, technical aspects and risks," explained Sudirman Meru.

 
watchlist Created with Sketch. Add EWC (ASX) to my watchlist
(20min delay)
Last
1.1¢
Change
0.001(10.0%)
Mkt cap ! $33.86M
Open High Low Value Volume
1.1¢ 1.1¢ 1.1¢ $61 5.555K

Buyers (Bids)

No. Vol. Price($)
1 549999 1.1¢
 

Sellers (Offers)

Price($) Vol. No.
1.2¢ 83333 1
View Market Depth
Last trade - 16.10pm 09/07/2024 (20 minute delay) ?
EWC (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.