GBG 0.00% 2.9¢ gindalbie metals ltd

sentiment, page-10

  1. 403 Posts.
    bit of good information i found in the december 10th 2010 release that i didnt know about the rail capacity GBG/Karrara have.

    copy and pasted from the release.

    "Some of the key areas where infrastructure has been upgraded include:
    • An increase in the capacity of the high-voltage power line, from 132kv to 330kv, connecting Karara to the
    State grid at Eneabba. This is sufficient to accommodate an ultimate production capacity of more than
    36Mtpa;
    • Improved rail haulage capacity of the 85km spur line connecting Karara to the existing rail line from
    Morawa-to-Geraldton, increasing the capacity of the spur line to +36Mtpa. This line is being built as a dual
    gauge to allow conversion from narrow to standard gauge in the future;"

    so they can transport up to 36mtpa on the Rail. So at least they have future thought in mind and if MGI(in the future)share their berth/port access like someone mentioned somewhere on the forum yesterday then they could eventually haul in the $ with the High %FE
 
watchlist Created with Sketch. Add GBG (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.