Sadly thanks to the slow response from Gladys the work on the self charging battery and the memory ink has ground to a halt, only work able to be done would be of a theoretical nature.
So this really only leaves work being done by Stealth Technologies at present, and perhaps planning for drilling of Leviathan assuming that those plans are still going ahead.
Good thing Stealth has a few things in progress at present. Contract negotiations with Honeywell for the ASV, work on the weed detector and designing a vehicle with drone launching capabilities for the defence force.
- Forums
- ASX - By Stock
- Serious Technical & Fundamental discussion only
Sadly thanks to the slow response from Gladys the work on the...
-
- There are more pages in this discussion • 517 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SOR (ASX) to my watchlist
|
|||||
Last
5.0¢ |
Change
0.007(16.3%) |
Mkt cap ! $22.34M |
Open | High | Low | Value | Volume |
5.4¢ | 5.4¢ | 4.4¢ | $65.99K | 1.329M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 221276 | 4.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.0¢ | 505171 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 221276 | 0.047 |
1 | 24892 | 0.046 |
2 | 49939 | 0.045 |
1 | 94393 | 0.044 |
2 | 153026 | 0.043 |
Price($) | Vol. | No. |
---|---|---|
0.050 | 505171 | 3 |
0.054 | 94953 | 4 |
0.057 | 6358 | 1 |
0.058 | 152000 | 2 |
0.059 | 137561 | 4 |
Last trade - 14.24pm 05/07/2024 (20 minute delay) ? |
Featured News
SOR (ASX) Chart |